Skip to content
English - United States
  • There are no suggestions because the search field is empty.

SmartPTO V3 Component ID (Rev 1.5)

WORKFORCE POWER TAKE-OFF · DOCUMENTATION

Component Identification

WorkForce Power Take-Off · formerly SmartPTO · V3 Component ID, Rev 1.5 (July 2022)

Labeled photos of the WorkForce Power Take-Off (V3) from every angle, identifying each internal and external component. Use the component list below to search by part name, then open the PDF to see exactly where it sits.

 

Download the labeled diagrams: WorkForce Power Take-Off V3 Component ID, Rev 1.5 (PDF)

 

This is the V3 platform, which carries two 14.4 kWh battery packs for 28.8 kWh of combined energy. The diagrams cover five views: front, back, left side, right side, and the hydraulics manifold.

Front view

  • 14.4 kWh Battery Pack (two packs, 28.8 kWh combined)
  • Fast Charger (Level 2)
  • Standard Charger (Level 1)
  • SEVCON Motor Controller (front)
  • Powertrain Controller (MBB)
  • SmartPTO Controller
  • System DC-DC Converter
  • Export Power DC-DC Converter
  • Telematics Gateway
  • Telematics Antenna
  • SEVCON Motor Controller (back)
  • High-Voltage PDU
  • Low-Voltage Fuse Holder
  • Motor
  • Hydraulic Pump
  • Hydraulics Manifold
  • Export Power DC-DC Converter
  • Standard Charger (Level 1)
  • Telematics Gateway
  • 14.4 kWh Battery Pack (two packs, 28.8 kWh combined)
  • 14.4 kWh Battery Pack
  • Telematics Antenna
  • Buzzer
  • Cooling Fan
  • Relief Valve
  • Check Valve
  • Return to Tank Port (“T”)
  • SmartPTO-side Purge Port (“P2”)
  • Truck-side Purge Port (“P3”)
  • Hydraulic Pressure Line Port
  • Hydraulic Suction Line Port
  • Load Sense Harness Connection (for EV trucks, 12-volt battery input from truck)
  • Display Harness Connection
  • Level 1 Charger Harness Connection
  • Level 2 Charger Harness Connection
  • 12/24-Volt Export Power Harness Connection
  • Hydraulic Pressure Line Port “P”
  • Hydraulic Pressure Line Port “P1”
  • Hydraulic Suction Line Port “S”
  • Hydraulic Suction Line Port “S1”
  • Return to Tank Port “T”
  • Check Valve Port “CV”
  • SmartPTO-side Purge Port “P2”
  • Truck-side Purge Port “P3”
  • Pressure Sensor Port “PS”
  • Temperature Sensor Port “TS”
  • Relief Valve (two)

Back view

Left side view

Right side view

External connections, controls, and hydraulic ports.

Harness connections:

Hydraulics manifold

Port and sensor callouts, with the labels used throughout the troubleshooting guides.

 

ViaTec WorkForce Power Take-Off (formerly SmartPTO V3) · Component Identification · full diagrams: Component ID Rev 1.5