title: Terex SmartPTO V3 Quick Start Guide
description: "Terex quick start for the SmartPTO V3: dash-display PTO setup, starting the pump from cab or control panel, hybrid bucket controls, and charging."
---

[![Viatec](https://www.viatec.us/wp-content/uploads/2026/04/cropped-new_viatec_logo_rev-300x100.webp)](https://www.viatec.us)

- [Products](https://www.viatec.us/products/)
  
  WorkForce Platform
  
    - [WorkForce Power ExportMobile power export from your fleet](https://www.viatec.us/workforce-power-export/)
    - [WorkForce Power GeneratorSilent, emission-free jobsite power](https://www.viatec.us/workforce-power-generator/)
    - [WorkForce Power Take-OffRun equipment with the engine off](https://www.viatec.us/workforce-power-take-off/)

  More
  
    - [WorkForce Site BoostTemporary grid-edge power](https://www.viatec.us/workforce-site-boost/)
    - [Fleet IntelligenceTelematics & idling insights](https://www.viatec.us/fleet-intelligence/)
- [Case Studies](https://www.viatec.us/case-studies-2)
  
  Featured
  
    - [Duke EnergyElectrifying utility fleets](https://www.viatec.us/case-studies-2)
    - [Town of ApexMunicipal fleet results](https://www.viatec.us/case-studies-2)
- [About Viatec](https://www.viatec.us/about/)
  
  Company
  
    - [Meet the Team](https://www.viatec.us/about/)
    - [News](https://blog.viatec.us?hsLang=en-us)
    - [Customer Service](https://help.viatec.us)
- [Request A Quote](https://www.viatec.us/request-a-quote/)

[Find A Reseller](https://www.viatec.us/find-a-reseller/) [Dashboard](https://telematics.viatec.us/)

- Products
  
  WorkForce Platform
  
  [WorkForce Power Export](https://www.viatec.us/workforce-power-export/) [WorkForce Power Generator](https://www.viatec.us/workforce-power-generator/) [WorkForce Power Take-Off](https://www.viatec.us/workforce-power-take-off/)
  
  More
  
  [WorkForce Site Boost](https://www.viatec.us/workforce-site-boost/) [Fleet Intelligence](https://www.viatec.us/fleet-intelligence/)
- Case Studies
  
  [Duke Energy](https://www.viatec.us/case-studies-2) [Town of Apex](https://www.viatec.us/case-studies-2)
- About Viatec
  
  [Meet the Team](https://www.viatec.us/about/) [News](https://blog.viatec.us?hsLang=en-us) [Customer Service](https://help.viatec.us)
- [Request A Quote](https://www.viatec.us/request-a-quote/)

[Find A Reseller](https://www.viatec.us/find-a-reseller/) [Dashboard](https://telematics.viatec.us/)

[Skip to content](https://service.viatec.us/terex-smartpto-v3-quick-start-guide#main-content)

English - United States

Show submenu for translations

![](https://service.viatec.us/hs-fs/hubfs/new_viatec_logo_rev.png?width=1600&height=579&name=new_viatec_logo_rev.png)

- [Products](https://www.viatec.us/staging/products-2/)
  
  Show submenu for Products

    - [Workforce Power Boost](https://www.viatec.us/staging/workforce-site-boost/)
    - [Workforce Power Take-Off](https://www.viatec.us/staging/workforce-power-takeoff/)
    - [Workforce Power Generator](https://www.viatec.us/staging/workforce-power-generator/)
    - [Workforce Power Export](https://www.viatec.us/staging/workforce-power-export/)
- [Case Studies](https://www.viatec.us/staging/case-studies-2/)
  
  Show submenu for Case Studies

    - [Town of Apex](https://www.viatec.us/staging/town-of-apex/)
    - [Duke Energy](https://www.viatec.us/staging/duke-energy/)
- [Company](https://www.viatec.us/staging/about-viatec/)
  
  Show submenu for Company

    - [Customer Service](https://www.viatec.us/staging/customer-service/)
    - [Meet the Team](https://www.viatec.us/staging/meet-the-team/)
    - [News](https://blog.viatec.us/)
- [Find a Reseller](https://www.viatec.us/find-a-reseller-tool/)
- [Dashboard](https://telematics.viatec.us/)

Open main navigation

Close main navigation

- [Products](https://www.viatec.us/staging/products-2/)
  
  Show submenu for Products

    - [Workforce Power Boost](https://www.viatec.us/staging/workforce-site-boost/)
    - [Workforce Power Take-Off](https://www.viatec.us/staging/workforce-power-takeoff/)
    - [Workforce Power Generator](https://www.viatec.us/staging/workforce-power-generator/)
    - [Workforce Power Export](https://www.viatec.us/staging/workforce-power-export/)
- [Case Studies](https://www.viatec.us/staging/case-studies-2/)
  
  Show submenu for Case Studies

    - [Town of Apex](https://www.viatec.us/staging/town-of-apex/)
    - [Duke Energy](https://www.viatec.us/staging/duke-energy/)
- [Company](https://www.viatec.us/staging/about-viatec/)
  
  Show submenu for Company

    - [Customer Service](https://www.viatec.us/staging/customer-service/)
    - [Meet the Team](https://www.viatec.us/staging/meet-the-team/)
    - [News](https://blog.viatec.us/)
- [Find a Reseller](https://www.viatec.us/find-a-reseller-tool/)
- [Dashboard](https://telematics.viatec.us/)
- English - United States
  
  Show submenu for translations
- Contact us

 Contact us

 How can we help you?

- There are no suggestions because the search field is empty.

1. [Service I Viatec](https://service.viatec.us/?hsLang=en-us)
2. [WorkForce Power Take-Off I Smart PTO I V3](https://service.viatec.us/workforce-power-take-off-i-smart-pto-i-v3?hsLang=en-us)
3. [Quick Start Guide](https://service.viatec.us/workforce-power-take-off-i-smart-pto-i-v3?hsLang=en-us#quick-start-guide)

# Terex SmartPTO V3 Quick Start Guide

## Terex quick start for the SmartPTO V3: dash-display PTO setup, starting the pump from cab or control panel, hybrid bucket controls, and charging.

- At the SmartPTO Main Control Panel, ensure the Emergency Stop pushbutton is reset. To reset the Emergency Stop, **TWIST** clockwise and **PULL** outward to allow the pushbutton to return to the OUT (reset) position.

> **Note:** If the Emergency Stop is active, the dash-mounted display will indicate the SmartPTO is “NOT DETECTED”.

![](https://service.viatec.us/hs-fs/hubfs/kb-smartpto-quick-start-terex/smartpto-terex-07.png?width=146&name=smartpto-terex-07.png) ![](https://service.viatec.us/hs-fs/hubfs/kb-smartpto-quick-start-terex/smartpto-terex-05.png?width=266&name=smartpto-terex-05.png)

- **Turn off** the vehicle ignition and allow the engine to stop running. After the engine has shut down, **turn** the ignition key forward to the **ON** position, without starting the engine. This powers accessory equipment (strobes, work lights, etc.)

![](https://service.viatec.us/hs-fs/hubfs/kb-smartpto-quick-start-terex/smartpto-terex-04.png?width=83&name=smartpto-terex-04.png)

- Prior to leaving the cab, turn ON the truck PTO system by pressing the **PTO** button on the dash-mounted display. The SmartPTO status should switch from “DETECTED” to “ALLOWED”.

![](https://service.viatec.us/hs-fs/hubfs/kb-smartpto-quick-start-terex/smartpto-terex-08.png?width=415&name=smartpto-terex-08.png)

- When you are ready to use the vehicle hydraulic systems, the SmartPTO pump can be started EITHER from the cab or from the exterior SmartPTO Main Control Panel. 
    - To start the SmartPTO pump from the truck cab, press the **E-PTO** button on the dash-mounted display, which will toggle from off to Green.
    - To start the pump from the SmartPTO Main Control Panel, **PRESS and HOLD** the **Pump Toggle** switch for 2 seconds to activate the SmartPTO hydraulic pump.

![](https://service.viatec.us/hs-fs/hubfs/kb-smartpto-quick-start-terex/smartpto-terex-09.png?width=118&name=smartpto-terex-09.png)

- When the hydraulic pump is activated, the Touch Encoder display will switch to the “Pump Status” screen (below), which shows operational status of the unit. Verify the Pump GPM and the Pump Pressure on the Touch Encoder display.

![](https://service.viatec.us/hs-fs/hubfs/kb-smartpto-quick-start-terex/smartpto-terex-06.png?width=380&name=smartpto-terex-06.png)

- Utilize the vehicle’s hydraulic systems per the normal operational procedures, for example: 
    - Deploy the vehicle outriggers
    - Switch to upper controls
    - Operate the overhead boom or winch
    - Use hydraulic tool attachments

> **Efficiency Tip:** When the chassis hydraulics are in “outrigger mode”, switch modes or turn OFF the SmartPTO pump as promptly as possible when work is completed to prevent wasting available SmartPTO energy.

SmartPTO LED Array Display Elements

1. **System Status:** (**Green** = On and Ready, **Red** = Stopped/Faulted)
2. **Pump Status:** (**Blue** = Standby Mode, **Green** = On)
3. **Battery State of Charge (SOC):** Displayed at 10% increments — shown below is 80% full.

![](https://service.viatec.us/hs-fs/hubfs/kb-smartpto-quick-start-terex/smartpto-terex-16.png?width=670&name=smartpto-terex-16.png)

SmartPTO Start/Stop from the Bucket

![](https://service.viatec.us/hs-fs/hubfs/kb-smartpto-quick-start-terex/smartpto-terex-13.png?width=340&name=smartpto-terex-13.png)

**To switch from SmartPTO to Engine Pump:**

- **Push and Release** the STOP HYBRID plunger to disable SmartPTO and restart the truck engine.

**To switch from Engine to SmartPTO Pump:**

- **Push and Release** the STOP/START ENGINE plunger, and then press the START HYBRID plunger and release to enable SmartPTO for hydraulic system operation.

Optional Electric AC (eAC) System Operation

![](https://service.viatec.us/hs-fs/hubfs/kb-smartpto-quick-start-terex/smartpto-terex-10.png?width=600&name=smartpto-terex-10.png)

If truck cab cooling is desired:

- Ensure all dash vents are open and the Mode Selector is set to Upper or Upper/Lower.
- Turn Fan speed to high and set the temperature selector all the way to cold.
- Turn Recirculation on, then press the “eAC” button to enable the electric AC compressor.

Charging the SmartPTO

### Standard Charging (Level 1)

- Plug a 15 Amp rated, 120V extension cord into the charging port. The SmartPTO LEDs turn ON to indicate charging.

![](https://service.viatec.us/hs-fs/hubfs/kb-smartpto-quick-start-terex/smartpto-terex-11.png?width=280&name=smartpto-terex-11.png)

> **⚠️ WARNING!** Using an improperly rated electrical cord could cause the cord to heat up, melt, or start a fire.

### Optional Fast Charging (Level 2)

- Plug into the SmartPTO J1772 EVSE (Level 2) charging port using a properly rated J1772 Charging Connector.
- **Press and HOLD** the Fast Charge “Start” button to initiate the charge session.
- Verify the unit is charging by checking the Touch Encoder Display or by monitoring the LED Array.

![](https://service.viatec.us/hs-fs/hubfs/kb-smartpto-quick-start-terex/smartpto-terex-14.png?width=280&name=smartpto-terex-14.png) ![](https://service.viatec.us/hs-fs/hubfs/kb-smartpto-quick-start-terex/smartpto-terex-15.png?width=280&name=smartpto-terex-15.png)

- [WorkForce Power Take-Off I Smart PTO I V3](https://service.viatec.us/workforce-power-take-off-i-smart-pto-i-v3?hsLang=en-us#main-content)

    - [Quick Start Guide](https://service.viatec.us/workforce-power-take-off-i-smart-pto-i-v3?hsLang=en-us#quick-start-guide)
    - [Operatorion Manual(s)](https://service.viatec.us/workforce-power-take-off-i-smart-pto-i-v3?hsLang=en-us#operatorion-manuals)
    - [Installation & Connections](https://service.viatec.us/workforce-power-take-off-i-smart-pto-i-v3?hsLang=en-us#installation-connections)
    - [System Specs and Visual Guide](https://service.viatec.us/workforce-power-take-off-i-smart-pto-i-v3?hsLang=en-us#system-specs-and-visual-guide)
    - [Battery & Maintenance](https://service.viatec.us/workforce-power-take-off-i-smart-pto-i-v3?hsLang=en-us#battery-maintenance)
- [WorkForce Power Take-Off I SmartPTO I V2](https://service.viatec.us/workforce-power-take-off-i-smartpto-i-v2?hsLang=en-us#main-content)

    - [Quick Start Guides](https://service.viatec.us/workforce-power-take-off-i-smartpto-i-v2?hsLang=en-us#quick-start-guides)
- [WorkForce Power Export I SmartAPU](https://service.viatec.us/workforce-power-export-i-smartapu?hsLang=en-us#main-content)

    - [Quick Start Guides](https://service.viatec.us/workforce-power-export-i-smartapu?hsLang=en-us#quick-start-guides)
- [WorkForce Power Generator I SmartPX](https://service.viatec.us/workforce-power-generator-i-smartpx?hsLang=en-us#main-content)

    - [Quick Start Guides](https://service.viatec.us/workforce-power-generator-i-smartpx?hsLang=en-us#quick-start-guides)
- [Training](https://service.viatec.us/training?hsLang=en-us)
- [Remote Support](https://service.viatec.us/remote-support?hsLang=en-us)
- [Warranty](https://service.viatec.us/warranty?hsLang=en-us#main-content)

    - [WorkForce Power Take-Off / Smart PTO](https://service.viatec.us/warranty?hsLang=en-us#workforce-power-take-off-smart-pto)

- [Products](https://www.viatec.us/staging/products-2/) 
    - [Workforce Power Boost](https://www.viatec.us/staging/workforce-site-boost/)
    - [Workforce Power Take-Off](https://www.viatec.us/staging/workforce-power-takeoff/)
    - [Workforce Power Generator](https://www.viatec.us/staging/workforce-power-generator/)
    - [Workforce Power Export](https://www.viatec.us/staging/workforce-power-export/)
- [Case Studies](https://www.viatec.us/staging/case-studies-2/) 
    - [Town of Apex](https://www.viatec.us/staging/town-of-apex/)
    - [Duke Energy](https://www.viatec.us/staging/duke-energy/)
- [Company](https://www.viatec.us/staging/about-viatec/) 
    - [Customer Service](https://www.viatec.us/staging/customer-service/)
    - [Meet the Team](https://www.viatec.us/staging/meet-the-team/)
    - [News](https://blog.viatec.us/)
- [Find a Reseller](https://www.viatec.us/find-a-reseller-tool/)
- [Dashboard](https://telematics.viatec.us/)

[![new\_viatec\_logo\_rev](https://service.viatec.us/hs-fs/hubfs/new_viatec_logo_rev.png?width=200&height=72&name=new_viatec_logo_rev.png "new_viatec_logo_rev")](https://service.viatec.us/?hsLang=en-us)

1927 B Perimeter Rd

Greenville, SC 29605

Copyright © 2026, Viatec

![Viatec](https://service.viatec.us/hs-fs/hubfs/new_viatec_logo_rev.png?width=400&name=new_viatec_logo_rev.png) A Force For Fleets™

Sign Up For Our Newsletter

Subscribe

© 2026 Viatec Inc. All Rights Reserved.

<https://www.facebook.com/viatec.us> <https://x.com/viatec_us> <https://www.linkedin.com/company/viatec-us> <https://www.instagram.com/viatec.us>

Products

- [WorkForce Power | Take-Off](https://www.viatec.us/workforce-power-take-off/)
- [WorkForce Power | Generator](https://www.viatec.us/workforce-power-generator/)
- [WorkForce Power | Export](https://www.viatec.us/workforce-power-export/)
- [WorkForce Site | Boost](https://www.viatec.us/workforce-site-boost/)

[Case Studies](https://www.viatec.us/case-studies-2)

- [Duke Energy](https://www.viatec.us/case-studies-2)
- [Town of Apex](https://www.viatec.us/case-studies-2)

[Idling Calculator](https://www.viatec.us/idling-calculator/)

Company

- [About](https://www.viatec.us/about/)
- [Team](https://www.viatec.us/about/)
- [News](https://blog.viatec.us?hsLang=en-us)
- [Privacy Policy](https://www.viatec.us/privacy-policy/)

Contact

- [Find a Reseller](https://www.viatec.us/find-a-reseller/)
- [Contact Viatec](https://www.viatec.us/contact/)
- [Request a Quote](https://www.viatec.us/request-a-quote/)
- [Customer Service](https://help.viatec.us)