Installation Training
Installation Training
For installers and upfitters who need setup, validation, and handoff guidance before a unit goes into service.
What’s covered
- Post-installation checks
- Hydraulic connector overview
- System validation before delivery
- Handoff to the operator / customer
Recommended videos
Watch the full training video first, then use these sections during setup (timestamps refer to the full video):
| Topic | Timestamp |
|---|---|
| After Installation | 1:22–2:04 |
| Hydraulic Connector | 6:01–7:11 |
| Enabling the Pump | 7:11–7:38 |
| Proper Charging | 4:38–4:55 |
Installation downloads
- Installation checklist [ link PDF ]
- Hydraulic connector reference [ link PDF ]
- Post-install validation sheet [ link PDF ]
For the full installation manual, see the SmartPTO V3 Installation Manual (verify slug). All quick references live on the Product Pamphlets & Downloads page.
Before delivery: Complete the post-install validation sheet and confirm charging and pump operation before handing the unit to the operator.
Ready for a live session?
Request Installation training and we’ll follow up to schedule.